Flat Refurbishment

Our Team finished the 3 Bedroom Flat Renovation Project at Succoth area in Edinburgh.
Just before Christmas Eve so exactly as planned!

Main tasks:
-Alterations to Main Bedroom (existing en-suite to be removed)
-Complete refurbishment to Main Bedroom
–Remove all walls/ceiling/floor coverings
–Skim coat plaster with fibre mesh bedded into it
–Painting & Decorating (including for coving, skirting and other woodwoork)
-Solid wood floor (oiled oak) to Hall (including all cupboards), Living Room and Dining Area
-Vinyl floor (high quality vinyl) to Kitchen, Bathroom, Shower Room and Boiler’s Cupboard

====

We have also started complete Bathroom Refurbishment on the 20th of December. It should be done before the end of 2015. Everything is going good so fingers crossed that we will “not transfer” any works from the old to the new year 🙂

Tranent continues

Extension completed.
All in time and to complete satisfaction of Client!

General construction details:
Floor: Insulated Concrete Slabs
Inner Leaf: Insulated Timber Frame with plasterboards and skim coat plaster finish
Outer Leaf: Blockwork with roughcast finish
Roof: Insulated Pitched Construction with concrete tiles
Electrical, Plumbing & Heating works included
All materials, windows & doors supplied

==========================

2nd stage: INTERNAL LINING, ALTERATIONS and COMPLETE KITCHEN REFURBISHMENT started now.

 

 

 