A small job in Hamilton done over last weekend. 1/ Hacking off and removing damaged/bosses roughcast and badly done base coat 2/ Primer coat 3/ New beads and trims 4/ Base adhesive coat with fibreglass mesh embedded 5/ System fixings 6/ Top coat (white dash receiver plus Classic Spar chips) 7/ Mastic sealant to protect the system from the top against weather/rain As you see, we provide the proper procedures to all our projects, regardless of their scale and size, because: Edinhome means Quality (confirmed by another great feedback)!